Shading a vast 4,200 sq.m of carpark area, the Al Khawaneej Solar Carpark Plant has become a standout feature of the Last Exit destination, blending architectural elegance with high-performance solar infrastructure. The structure goes beyond conventional shading — it delivers a striking visual identity that complements the character of Last Exit while generating a substantial 654.0 kWp of clean energy, contributing directly to the UAE’s sustainability goals.
Biston engineered and delivered the steel structure that brings this architectural marvel to life, balancing the demands of large-span coverage, solar panel integration, and aesthetic refinement. The result is a carpark shading solution that performs on multiple levels — providing protection from the sun, generating renewable energy at scale, and standing as an eye-catching landmark within its surroundings.



Biston Construction Company is a trusted civil and steel construction partner delivering design, fabrication, and erection services since 2006. We combine experience, precision, and innovation to complete residential, commercial, and industrial projects that meet quality standards and client expectations.
Factory in DIC
Dubai, U.A.E