• Client: Future Scaffolding and Aluminum Industries
  • location: Dubai Industrial City, Dubai
  • Year Completed; 2010
  • duration: 6 Months
  • consultant: Civic Design Engineering
The Challenges

This project was Located at Dubai Industrial City with an approximate Built-up area of 8000 m2 Ground and 250 m2 Mezzanine. We also made perfect modifications for the steel depending on the variety of drawings with commitment in all project stages.